15 years focus on the development and production of slurry filters and wastewater treatment

banner

Current page:

Home

/

News

/

Installation and debugging of plate and frame filter press.

News

Contact Us

Tel:

+86-757-8633-0278

Email:doyen@doyenchina.com

Fax:+86-757-86287390

Address:Room 201, Building No. 24, Yicui Rose Garden, No. 2, Jihua 7 Road, Chancheng District, Foshan City, Guangdong Province, China 528000.

Installation and debugging of plate and frame filter press.

     This article is arranged and released by belt filter press. If you feel this article is good, please reprint it and tell your friends by the way! Feel your support for our company, professional manufacturer of buried sewage treatment equipment.

Installation and debugging of plate and frame filter press

  1. The embedded hole shall be designed according to the foot size provided by the supplier, and the twice grouting method shall be adopted.
  2. There should be enough space around the filter press to facilitate operation and maintenance.
  3. The filter press shall be placed horizontally on the floor, and the rear roof plate shall be fixed on the foundation with foot bolts. (Note: the bottom bolt is usually only fixed on the rear roof plate. Due to the pressure of the plate frame, it will bend downward to a certain extent due to the pressure of the plate frame. When the filter press is pressed, it will be straightened, resulting in a small amount of displacement. If both ends are fixed at the same time, it may cause the pressure not tight or damage the frame.
  4. The material and specification of filter cloth shall be determined according to the material, pressure and temperature of filtration, and appropriate filter cloth shall be selected.
  5. The plates and frames shall be arranged on the rack in accordance with the requirements, and the processed filter cloth shall be arranged on the filter plates in order. The feeding holes and rinsing holes between the filter plates shall be corresponding.
  6. Turn on the power and check whether it is normal. For mechanical transmission, check whether the positive and negative rotation of the motor meets the requirements, whether the oil in the reducer and head oil cup is full, and whether the lubricating oil of screw rod and gear is well added. Hydraulic transmission inspection gear pump running sound is normal, hydraulic system leakage, piston rod in and out is smooth.

     

     Doyen specializes in providing belt press equipment for the Southeast Asian market. Welcome to visit our workshop, according to the actual situation of your company, develop a more scientific dehydration program.Welcome to joyce@doyenchina.com or visit https://www.doyenchina.com.

Jun-30-2020

admin

Technical Support: Magic Lamp